Our works for this project included the full turnkey package. We worked alongside BMA to assist with the procurement of key items such as pumps, drives, handrail, grating, valves, pipework and other miscellaneous componentry. We also looked after the fabrication of plate and structural steelwork packages, which were integral to the installation of the new Horizontal Belt Filter being supplied by BMA.
This project once again gave us the opportunity to work alongside our trusted subcontractors for the civil, electrical and instrumentation works. Once commissioned, the upgrade would see an increase in the recovery of dry product through the mine.
The project was completed safely and on time, demonstrating our capabilities in this field and establishing our presence as a key contractor for further works at Goonyella moving forward.
Australian Gas Infrastructure Group (AGIG) are developing the Hydrogen Park Gladstone project, for the small scale production of hydrogen and injection into the natural gas distribution network as a 10% blended mix. A 175kW NEL electrolyser is the primary hydrogen generation equipment installed, with supporting infrastructure to facilitate the generation and injection of the gas into the distribution grid.
Peak Downs Mine (PDM) identified the Coal Thickener Bridge was at its end of life and required replacing. It supports a range of services including mechanical drives, hydraulics, electrical and control services, flocculent dosing system, compressed air and coal slurry and water pipes. It also provides the suspension of the feed well and thickener raking system.
Fitzroy Coal Management are currently constructing a new underground coal mine, Ironbark No1, located 50km northeast of Moranbah Queensland Walz Group were engaged to complete full Structural, Mechanical and Piping Installation as well as managing an electrical subcontractor to complete the E&I installation works.
Walz were engaged to complete the Structural, Mechanical and Piping construction scope for the main kiln bag filter replacement project, at Cement Australia’s Gladstone plant.
Complete coating patch repairs on gantry stacker girders and associated structural elements from top of rail to 1m below rail level.