Safety-led. Capability-driven.
Built to perform.
Safety-led. Capability-driven. Built to perform.
Maintenance & Shutdowns
Walz Group takes the pressure off scheduled shutdowns and maintenance.
We have a proven track record of delivering multidisciplinary solutions that meet our clients’ needs. Safety, sustainability, and meeting critical timelines are the cornerstones of success and heavily impact future efficiency and operability.
Offering a full suite of industrial maintenance and site shutdown services, Walz Group’s specialist team will tailor a maintenance strategy to keep your operation running safely and efficiently with the shortest possible downtime.
From maintenance services to capital works projects, full shutdowns, and facilities management, we help our clients to limit capital cost and maximise productivity. Supported by our Gladstone fabrication facilities, our services cover structural, mechanical and piping works, along with any other specialty works that our client may require.
Australian Gas Infrastructure Group (AGIG) are developing the Hydrogen Park Gladstone project, for the small scale production of hydrogen and injection into the natural gas distribution network as a 10% blended mix. A 175kW NEL electrolyser is the primary hydrogen generation equipment installed, with supporting infrastructure to facilitate the generation and injection of the gas into the distribution grid.
Peak Downs Mine (PDM) identified the Coal Thickener Bridge was at its end of life and required replacing. It supports a range of services including mechanical drives, hydraulics, electrical and control services, flocculent dosing system, compressed air and coal slurry and water pipes. It also provides the suspension of the feed well and thickener raking system.
Fitzroy Coal Management are currently constructing a new underground coal mine, Ironbark No1, located 50km northeast of Moranbah Queensland Walz Group were engaged to complete full Structural, Mechanical and Piping Installation as well as managing an electrical subcontractor to complete the E&I installation works.
Walz were engaged to complete the Structural, Mechanical and Piping construction scope for the main kiln bag filter replacement project, at Cement Australia’s Gladstone plant.
Complete coating patch repairs on gantry stacker girders and associated structural elements from top of rail to 1m below rail level.
Quality and Compliance
Quality is at the core of our fabrication services. Our processes are governed by robust quality assurance systems, documented traceability and inspection regimes to ensure structural integrity and compliance with client and industry standards. Every spool and assembly is verified for dimensional accuracy, welding integrity and specification alignment before release.
Collaborative Delivery
We work collaboratively with clients, engineers and site personnel from design review through to fabrication and handover. This integrated approach ensures clarity of requirements, consistency in execution and responsiveness to changing project needs — giving clients confidence from workshop to site.