As part of this contract, Walz Group provided marine equipment and specialist personnel to support the shutdown scheduled as part of the project, and remove associated temporary works. Throughout the project, we continually adapted to the ever-changing weather conditions and modifications to schedule. By working closely with our client and taking an agile approach to resourcing requirements, we were able to meet all project milestones.
In its entirety, the expansion increased capacity at the terminal from 44 million tonnes to 55 million tonnes. The work included construction of a new berth and land reclamation, as well as building and fitting out new trestles, conveyers, and ship loaders.
Specifically, our scope included the provision of the following specialist equipment together with expert operators.
Australian Gas Infrastructure Group (AGIG) are developing the Hydrogen Park Gladstone project, for the small scale production of hydrogen and injection into the natural gas distribution network as a 10% blended mix. A 175kW NEL electrolyser is the primary hydrogen generation equipment installed, with supporting infrastructure to facilitate the generation and injection of the gas into the distribution grid.
Peak Downs Mine (PDM) identified the Coal Thickener Bridge was at its end of life and required replacing. It supports a range of services including mechanical drives, hydraulics, electrical and control services, flocculent dosing system, compressed air and coal slurry and water pipes. It also provides the suspension of the feed well and thickener raking system.
Fitzroy Coal Management are currently constructing a new underground coal mine, Ironbark No1, located 50km northeast of Moranbah Queensland Walz Group were engaged to complete full Structural, Mechanical and Piping Installation as well as managing an electrical subcontractor to complete the E&I installation works.
Walz were engaged to complete the Structural, Mechanical and Piping construction scope for the main kiln bag filter replacement project, at Cement Australia’s Gladstone plant.
Complete coating patch repairs on gantry stacker girders and associated structural elements from top of rail to 1m below rail level.