Early in 2017, it was identified that the heat exchanger duct between the clinker cooler and the inlet to heat exchanger no.1 (HE1) had reached the end of its life, and was significantly impacting on plant production. Cement Australia engaged Walz Group to replace the equipment to return the kiln performance to full capacity. The project required us to remove and replace the failing heat exchanger, ductwork, inlet chamber, associated supports, and specified tubes during a time critical shutdown.
We utilised our dedicated fabrication facility to manufacture all the ductwork, inlet chamber, and the associated supports and components. We also applied protective coating as required. Prior to the shutdown for the replacement works, we reinforced the plant foundation and structure to ensure it could accommodate additional loads.
Our comprehensive plant and equipment fleet was invaluable for this project, which required craneage and scaffolding to remove and replace the existing structure.
Australian Gas Infrastructure Group (AGIG) are developing the Hydrogen Park Gladstone project, for the small scale production of hydrogen and injection into the natural gas distribution network as a 10% blended mix. A 175kW NEL electrolyser is the primary hydrogen generation equipment installed, with supporting infrastructure to facilitate the generation and injection of the gas into the distribution grid.
Peak Downs Mine (PDM) identified the Coal Thickener Bridge was at its end of life and required replacing. It supports a range of services including mechanical drives, hydraulics, electrical and control services, flocculent dosing system, compressed air and coal slurry and water pipes. It also provides the suspension of the feed well and thickener raking system.
Fitzroy Coal Management are currently constructing a new underground coal mine, Ironbark No1, located 50km northeast of Moranbah Queensland Walz Group were engaged to complete full Structural, Mechanical and Piping Installation as well as managing an electrical subcontractor to complete the E&I installation works.
Walz were engaged to complete the Structural, Mechanical and Piping construction scope for the main kiln bag filter replacement project, at Cement Australia’s Gladstone plant.
Complete coating patch repairs on gantry stacker girders and associated structural elements from top of rail to 1m below rail level.