Walz Group was contracted by Sedgman to provide all structural, mechanical and piping installation services, and construction works required to execute the project.
We provided construction services for all areas of the development, including the concentrator, tailings dam, and the port stockpile. These works incorporated the installation of around 700t of structural steel, including guards, pulley frames, and conveyor galleries.
Mechanical installation comprised idlers, pulleys, drives, scrapers, belts, dump hopper, product bin, chutes, sump pumps, transfer pumps, process water pumps, return water pumps and numerous modifications to the existing plants. The piping component included installation of 1,500m of piping plus 2,400m of small bore piping.
Australian Gas Infrastructure Group (AGIG) are developing the Hydrogen Park Gladstone project, for the small scale production of hydrogen and injection into the natural gas distribution network as a 10% blended mix. A 175kW NEL electrolyser is the primary hydrogen generation equipment installed, with supporting infrastructure to facilitate the generation and injection of the gas into the distribution grid.
Peak Downs Mine (PDM) identified the Coal Thickener Bridge was at its end of life and required replacing. It supports a range of services including mechanical drives, hydraulics, electrical and control services, flocculent dosing system, compressed air and coal slurry and water pipes. It also provides the suspension of the feed well and thickener raking system.
Fitzroy Coal Management are currently constructing a new underground coal mine, Ironbark No1, located 50km northeast of Moranbah Queensland Walz Group were engaged to complete full Structural, Mechanical and Piping Installation as well as managing an electrical subcontractor to complete the E&I installation works.
Walz were engaged to complete the Structural, Mechanical and Piping construction scope for the main kiln bag filter replacement project, at Cement Australia’s Gladstone plant.
Complete coating patch repairs on gantry stacker girders and associated structural elements from top of rail to 1m below rail level.