BMA Hay Point – Sustaining Shutdown Works

01 location
Hay Point, Queensland, Australia
02 client
BM Alliance Coal Operations Pty Ltd
03 duration
8 Months
04 completed
December 2019
Continuing our working relationship with BMA at Hay Point, we were again engaged to provide marine assistance for a critical shutdown on one of their shiploaders. These works had us working alongside BMA and its nominated Head Contractor.

This project required the services of our marine equipment and specialist personnel to assist with the planned works that would be carried out during a 12 week outage. The planned works would see a range of maintenance activities completed on the shiploader to ensure it continues to operate reliably and safely.

As with all marine based works, this Project brought with it the need for our crew to continually adapt to the ever-changing weather conditions and modifications to schedule. By working closely with BMA and its Head Contractor, we were able to stay ahead of the game and address any hurdles in a safe and timely manner.

For these works, we provided the following specialist equipment together with expert operators:

  • 1 x self-elevating platform with 120t crawler crane
  • 1 x self-elevating platform with 250t crawler crane
  • 1 x flat top barge
  • 2 x tugs
  • 1 x work boat
  • 1 x crew boat